We have recently completed our state-of-the art filling facility in Wuxi, China. The facility covers an area of 2550m2/ 27450 sqft. Our aseptic filling operations take place in a Grade A isolator and RABS area with Grade C background. We have equipped the manufacturing facility with three filling suits. This provides us with the flexibility and resources to manufacture to your specific needs and requirements. As a result, we would also have the capability to meet current demand. However, we have also prepared capacity to be able to meet future demand. In addition, we operate our facility and aseptic fill and finish manufacturing according to GMP standards.

